top of page

Tai Po Civic Centre

SECTOR

ASD Government

LOCATION

Tai Po, Hong Kong

Home > Projects >Government > 

Tai Po Civic Centre

OVERVIEW

The facility underwent a comprehensive upgrading project led by the Architectural Services Department, designed by Design 2. The renovation expanded the foyer and auditorium, added a flexible Black Box Theatre, and upgraded stage technology. It also introduced better support through new passenger lifts, escalators, and a babycare room.

IMPACT

The revitalized venue incorporated the Gypsum Block Walling System (1110, 1115), installed with GA-90 Gypsum Adhesive. The GA-90's high adhesive strength ensured the integrity of the sound-insulating, fire-resistant block walls, creating a safe and acoustically controlled environment suitable for a busy shared community space.

PROJECT DETAILS

Client / Department

Architectural Services Department

Location

Tai Po, Hong Kong

Project Type

Performing Arts Venue

Scope

Facility upgrading and improved technology.

KEY CONTRIBUTIONS

PROJECT HIGHLIGHTS

Revitalised Community Cultural Hub

Delivered durable internal wall systems for major venue reconstruction. 

Modernised Performance & Accessibility

Provided robust internal partitions for upgraded stage technology and audio-visual systems.

Enhanced Audience & Community Experience

Contributed to a revitalised venue that promotes youth arts and cultural development.

PRODUCTS / SOLUTIONS USED

CBR-233_Product_V1.0_edited.png

1110/1115/1180

Gypsum Block

View Details
CBR-233_Product_V1.0_edited.png

GA-90

Gypsum Adhesive

View Details

Gypsum Block Walling System

Products Used: 1110, 1115

Fire Resistant Walls

Products used: GA-90

Sustainable Construction Materials

Products Used: 1110, 1115, GA-90

Acoustic & Structural Performance

Products Used: 1110, GA-90

PROJECT GALLERY

Pink Poppy Flowers
Pink Poppy Flowers
bottom of page