top of page

Home > Projects > Residential > 

Lohas Park Phase 7A Montara

SECTOR

Residential

LOCATION

Tseung Kwan O, Hong Kong

Lohas Park Phase 7A Montara

OVERVIEW

Designed by P&T, Lohas Park Phase 7A Montara is a two-tower residential development completed in October 2021. Part of the broader O'EAST seafront series, the 616-unit estate is located adjacent to LOHAS Park Station and is surrounded by waterfront promenades and extensive green spaces.

IMPACT

GreenTech Building Materials provided its high-performance Gypsum Block Walling System (1110), installed with GA-90 to ensure strong, fire-resistant masonry joints for the internal partitions of this large-scale residential development. This material system was ideally suited to the demanding residential environment, where durability, acoustic insulation, and fire safety are essential.

PROJECT DETAILS

Client / Department

MTR Corporation & Wheelock Properties

Location

Tseung Kwan O, Hong Kong

Project Type

Private Residential

Scope

Two residential towers connected to The LOHAS shopping mall.

KEY CONTRIBUTIONS

PROJECT HIGHLIGHTS

Convenience and Transit Development

Supported a development integrated with the Lohas Park MTR station and a major retail mall.

High-End Residential Standards

Delivered robust walling systems for premium residential units within the Lohas Park.

Quality Construction Partnership

Collaborated with Wheelock Properties and China Overseas on this landmark residential phase.

PRODUCTS / SOLUTIONS USED

CBR-233_Product_V1.0_edited.png

1110/1115/1180

Gypsum Block

View Details
CBR-233_Product_V1.0_edited.png

GA-90

Gypsum Adhesive

View Details

Gypsum Block Walling System

Products Used: 1110

Fire-Resistant Walls

Products Used: GA-90

Residential Walling System

Products Used: 1110, GA-90

Sustainable Construction Materials

Products Used: 1110, GA-90

PROJECT GALLERY

Pink Poppy Flowers
Pink Poppy Flowers
bottom of page