.jpg)
Home > Projects > Hospital >
Queen Mary Hospital (Phase 1)
Queen Mary Hospital (Phase 1)
SECTOR
Healthcare
LOCATION
Pok Fu Lam Road, Hong Kong
OVERVIEW
Designed by Simon Kwan & Associates, the project delivers a new 26-storey Clinical Services Building with additional beds, operating theatres, and specialist clinics for Hong Kong Island. The redevelopment also includes a link bridge and extensive landscaping. The project achieved BEAM Plus certification and received the Green Contractor Gold Award for four consecutive years.
IMPACT
GreenTech Building Materials provided its high-performance Gypsum Block Walling System (1110), installed with GA-90 to ensure fire-resistant masonry joints with high compressive strength for the new clinical tower. The walls were sealed with PMS-11 to block moisture, then finished with GP-2L and GS-80 to provide smooth surfaces for decorative finishes across the hospital's stringent healthcare environments.
PROJECT DETAILS
Client / Department
Architectural Services Department
Completion Date
2024
Project Type
Hospital Redevelopment
Scope
34-storey Clinical Block 1 replacing three existing buildings.
KEY CONTRIBUTIONS
PROJECT HIGHLIGHTS
Award-Winning Healthcare Infrastructure
Supported a project that received the Green Contractor Gold Award for four consecutive years (2019–2022).
Critical Clinical Environment Delivery
Provided moisture-sealed, fire-resistant walling solutions with smooth pH-neutral finishing for demanding clinical areas.
Green Building Recognition
Contributed to a project that has achieved BEAM Plus Green Building certification for its sustainable design.
PRODUCTS / SOLUTIONS USED
Gypsum Block Walling System
Products Used: 1110
Fire-Resistant Walls
Products Used: GA-90
Smooth Plaster Finish
Products Used: GP-2L, GS-80
Moisture Barrier Protection
Products Used: PMS-11
PROJECT GALLERY






.png)