
Home > Projects > Hospital >
Hong Kong Baptist Hospital
Hong Kong Baptist Hospital
SECTOR
Healthcare
LOCATION
Kowloon Tong, Hong Kong
OVERVIEW
Designed by Three's Architects, the phased redevelopment transforms Blocks A, B, and C into an integrated "Smart Hospital." By 2034, the hospital will expand to 700 beds with advanced operating theatres, smart technologies, and upgraded hardware. The project serves as a model for future-ready healthcare infrastructure in Hong Kong.
IMPACT
GreenTech Building Materials provided its high-performance Gypsum Block Walling System (1110), installed with GA-90 to ensure fire-resistant masonry joints, and sealed with PMS-11 to block moisture transfer. For tiling work, we supplied CTF-858 for strong tile adhesion suitable for all environments. This material system was ideally suited to the demanding healthcare environment, where durability, hygiene, and safety are paramount.
PROJECT DETAILS
Client / Department
Hong Kong Baptist Hospital
Completion Date
In Progress
Project Type
Healthcare
Scope
Phased Blocks A, B, C into a composite building.
KEY CONTRIBUTIONS
PROJECT HIGHLIGHTS
Smart Hospital Transformation
Supported the hospital's expansion to become a 700-bed "Smart Hospital" with smart technologies.
High-Performance Healthcare Walling
Delivered moisture-sealed, fire-resistant walling systems with high-strength tile adhesive for demanding clinical environments.
Sustainable & Long-Term Impact
Aligned with the project's pursuit of BEAM Plus New Buildings v2.0 standards through low‑carbon construction materials.
PROJECT GALLERY





.png)