top of page
Home > Projects > Commercial >
Cingleot Premium Logistics Centre at HKIA
Cingleot Premium Logistics Centre at HKIA
Logistics / Air Cargo Hub
SECTOR
Logistics & Aviation
LOCATION
Hong Kong International Airport, Hong Kong

OVERVIEW
Designed by Aedas, the 12-storey logistics centre that facilitates 1.5 million tons of cargo handling per annum and features fully automated warehouse. It includes temperature-controlled handling, ramp access to all floors, and structural designs enabling robotics and automated technology.
IMPACT
GreenTech Building Materials provided its high-performance Gypsum Block Walling System (1115), installed with GA-90 to ensure strong, fire-resistant masonry joints for the internal partitions of this large-scale industrial facility. The 1115 blocks offered excellent durability and fire resistance suited to the demanding logistics environment across the warehouse floors, cargo processing areas, and fulfilment spaces.
PROJECT DETAILS
Client / Department
Hong Kong Cingleot Investment Management Limited
Location
Hong Kong International Airport, Hong Kong
Project Type
Logistics / Air Cargo Hub
Scope
12-storey logistics facility with ramp access to all floors.
KEY CONTRIBUTIONS
PROJECT HIGHLIGHTS
World-Class Logistics Infrastructure
Delivered high-density internal walling systems for one of Hong Kong's most advanced logistics centres.
Sustainable & Green Building Excellence
Aligned with the project's BEAM Plus Gold and LEED Gold certifications.
Trusted Partnership
Collaborated with the Able-Build King Joint Venture and Aedas on a strategic e-commerce hub (eHub).
PROJECT GALLERY


bottom of page

